• 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Tube wells - GROUND WATER ENGG (SEC-C ) Mdu B.tech Notes
#1
            Contents :-
  • Definition of tube well
  • Optimum capacity
  • Silting of tube well
  • types of tube wells
  • components of tube well
  • construction & working of tube wells
  • site selection
  • Drilling operations & its methods
  • well screen assembly installation
  • Verticality & alignment of tube wells
  • development of tube well
  • construction & corrosion and failure of tube wells
  • gravel packing
  • pumping equipment
​                 thanks 
                     Student suvidha.com's Team

Part Time Work For Students

Part Time Work

Win Free Netflix Account

Part Time Work




.zip   Ground Water Engg ( SEC-C) Mdu B.tech Notess.zip (Size: 10.51 MB / Downloads: 10,939)
  Reply


Messages In This Thread
Tube wells - GROUND WATER ENGG (SEC-C ) Mdu B.tech Notes - by naeemkhan - 08-27-2014, 09:42 PM

Possibly Related Threads…
Thread Author Replies Views Last Post
  GROUND WATER ENGG (SEC-A ) Mdu B.tech Notes naeemkhan 7 18,544 05-31-2015, 01:20 PM
Last Post: rusty cool
  Artificial Recharge of Ground Water - GROUND WATER ENGG (SEC-D ) MDU B.TECH NOTES naeemkhan 0 7,169 09-28-2014, 12:00 PM
Last Post: naeemkhan
  compressibility of aquifers Btech notes for hydrology and ground water engineering rkrusty 0 6,007 09-19-2014, 11:19 AM
Last Post: rusty cool
  GROUND WATER ENGG (SEC-B ) Mdu B.tech Notes naeemkhan 0 8,946 08-05-2014, 03:27 PM
Last Post: naeemkhan

Forum Jump:


Users browsing this thread: 1 Guest(s)